Latest

Lagos-Abeokuta Road: Re-construct with concrete or leave – Umahi tells contractor

By Lydia Ngwakwe
Lagos, Oct. 8, 2024 (NAN) The Minister of Works, Sen. Dave Umahi, has directed that the Lagos-Abeokuta Expressway should be re-constructed with concrete pavement to address the threat of water to asphalt pavement.

Umahi gave the directive during an inspection of emergency repairs of a seven-kilometer stretch of the road within Lagos State, on Tuesday.

He noted that the Ogun section of the road was already handled by the  state government.

The minister said that concrete pavement would address the threat of water to asphalt pavement, assuring that funds would soon be released for completion of repairs of the remaining 11-kilometer stretch.

He told the contractor handling the emergency repairs to concentrate on deploying stone basement and re-open it to traffic.

The minister added that asphalt could be laid by mid  November.

He said that due diligence was  in progress for comprehensive re-construction of the expressway.

“My recommendation for this road has been to use concrete, and it looks that the investor insisted on using asphalt.

“My coming here today has re-inforced my belief and my conviction that what we will use here will be concrete.

” If the investor will not use concrete, he should go out of the road,” he said.

In her remarks, the Federal Controller of Works in Lagos State, Mrs Olukorede Kesha, thanked the minister for his interventions to bring succour to users of the expressway.

She said, “Befoe now, this place was impassable. As I said in the news the last time, it was drum holes not potholes and it was impassable.

“With your directive, sir, the contractor moved to site, and we can see that life is being restored back to the highway.”

The News Agency of Nigeria (NAN) reports that the Federal Government had on Sept. 30, said that the palliative works would be completed within two weeks.

The palliative works involve filling of drum holes, laying stone bases and applying a binding layer to ensure a smoother road surface. (NAN)